Friday,  July 6, 2012 • Vol. 12--No. 358 • 5 of 30 •  Other Editions

Dick Kolker is working on putting gravel around his sump pump discharge pipe that is now routed directly into a new storm sewer drain.

A storm sewer system is being installed on the south side of Ninth Avenue between Broadway and First Street.

A pipe is being lifted for the storm sewer project.

Lots of dirt is being hauled out on First Street.

© 2012 Groton Daily Independent • To send correspondence, click here.