Wednesday,  July 4, 2012 • Vol. 12--No. 356 • 6 of 32 •  Other Editions

Road reconstruction well underway

Reconstruction of North First Street was well underway on Tuesday. The top left photo features the construction crew rolling out the fabric. Then the top right photo shows that a gravel base was moved into place. The bottom two photos show the drain tile that is put in place on the edges of the roads.

© 2012 Groton Daily Independent • To send correspondence, click here.