Dick Kolker is working on putting gravel around his sump pump discharge pipe that is now routed directly into a new storm sewer drain.
A storm sewer system is being installed on the south side of Ninth Avenue between Broadway and First Street.
A pipe is being lifted for the storm sewer project.
Lots of dirt is being hauled out on First Street.